Skip to product information
1 of 7

Shires

Shires Extra Long 9ft Lead Rope

Shires Extra Long 9ft Lead Rope

Regular price $12.99
Sale price $12.99
Size
Color
Usually Ships in 2-4 business days
Oversize Fee: $0.00
This item not eligible for additional promotional discounts.

SKU:E045884 9 BLK

Shires Extra Long Lead Rope is ideal for loading or leading.

Comfortable in the hand, this extra Long leadrope features a practical swivel trigger clip for easy fastening. 9 Ft

Model Numbers and UPCs

Style Item NumberUPC
Black / 9 Ft E045884 9 BLK 5051771737003
Blue / 9 Ft E045884 9 BLU 5051771737027
Green / 9 Ft E045884 9 GRN 5051771737010
Orange / 9 Ft E045884 9 ORG 5051771737034
Pink / 9 Ft E045884 9 PNK 5051771737041
Purple / 9 Ft E045884 9 PPL 5051771737058
Red / 9 Ft E045884 9 RED 5051771737065
Sky / 9 Ft E045884 9 Sky 5051771737072

Returns

If you are not completely satisfied with an item, you may return it within 30 days from date received. Please note: item(s) must be new, unused, in original condition and box, including all parts, accessories, and packaging. Please DO NOT SHIP footwear (boots or shoes) in the manufacturer’s original box. Do not write or attach shipping labels to the manufacturer’s original box, you must ship all footwear in a protected box with the original box packed inside.

You must call us at 1.888.653.0026 to obtain a Return Authorization Number (RA#) and shipping instructions. Include a copy of the original invoice with your return and write your RA# visibly on the outside of the shipping package and on the packing slip.

See our full return policy

View full details