Wife flew to PA for a couple weeks this past Wed. Her parents are starting have some issues and she wanted to spend some good quality time with them.
Kitchen is SLOWLY being remodeled. Floor, counter, back splash. It was SUPPOSED to be done before the wife left, but.... Floor is 99% done. Counter was put in yesterday. No clue when plumber is coming to finish up dishwasher and sink or when back splash will be done. Hopefully it will be done by the time The Wife gets back. The Wife is doing the cabinets.
Heading to VA today taking old fridge to son's and stuff from my sister that he wanted. Truck and small trailer full. They need a 2nd fridge as we have problems loading our wine and beer when we visit.
When I get back I need to get a the horses feet done. I hate doing feet in the Summer as it is so hot. One horse wipes me out. So I do One A Day. Been thinking it may be time to hire a professional and I can do the minor stuff between visits.